Installation and initial commissioning | 6
Hidrostal AG 27 / 49
6 Installation and initial
commissioning
The system manufacturer is responsible for the installation and initial startup
of the pump as part of system construction or modernization. The system
manufacturer hands over an operational system to the company operating
the plant. Installation and initial startup are thus not included in these
operating instructions.
Chapter Replacing the pump [▶37] explains how to replace a defective
pump with a replacement pump.