EasyManua.ls Logo

Hitachi RX - 7.1 Manage messages

Hitachi RX
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-30 Long-term Shutdown
Com=0
Process : Process prior to
long-term shutdown
Remove the tube connection block from reservoir
and clean the end of it.
And then place the tube connection block in a beaker charged
with 100ml of makeup.
When ready, press <Start/Continue>.
Operation guide
Proc. status: In progress
Circulation control [Service     ]
Start/Continue
Abort
InkDrainage
Systemclean
InkDrainage
Systemclean
InkDrainage
Systemclean
Proc. time : Approx. 6 minutes
2015.07.0712:45
After draining is completed, follow the operation guidance on the screen and
place the recovery block of the Main ink tank back to original position.
Clean the end of recovery block with makeup before placing the recovery block back in.
8
The following guidance appears.
Remove the tube connection block from the ink reservoir and clean the end of it.
(This work may be skipped, as it is the same work as shown in step 1.)
And then place the tube connection block in a beaker charged with 100ml of
makeup.
9
Tube connection block
Beaker
Press Start/Continue .
Auto cleaning in the circulation system starts.
10

Table of Contents

Other manuals for Hitachi RX

Related product manuals