23
Upgrading the Gateway Firmware
5.2.2 To Verify the Upgrade
1. After the restart, log into the configuration tool.
2. Click Diagnostic.
3. Click About and verify that the new version of the GLSS Gateway is shown.
5.2.3 LED Indications During the Upgrade
While the gateway is downloading the firmware, the Green-color LED indicator DL4 will be ON.
If the LED is indicating differently, refer
Table 2.2, “LED Indicators and Their Messages,” on page 10
to
know the operational status. If there is an issue, refer to the
5.3, "Troubleshooting"
section to fix it or
contact Honeywell technical support.