Installation Guide SMX-AUS
NS-MN-0030 / 11.2020 11
2.5.1 Power Ratings
When mains is disconnected, the maximum current drawn by the panel from the batteries is 0.7 A in the quiescent condition and 6.97 A in the alarm condition.
The current value may vary as per the load conditions.
FOR PRIMARY POWER CABLE CONNECTIONS, THE USE OF RIGID CONDUIT IS REQUIRED.
3 Installation
3.1 Installation Procedure
Perform the following steps to install the fire alarm control panel:
1. Unboxing the panel
Remove the panel from the package and check the product completely before you discard the packaging box.
Check the product to see if any damage has occurred during the transit.
If there is no damage, then proceed with the installation .
If the product is damaged, return to supplier, re-using the same package wherever possible. Include written details of the damage.
Fig. 2: Checking for damage