Installation Guide SMX-AUS
14 NS-MN-0030 / 11.2020
3. Install two 26 Ah batteries inside the panel. Recommended battery : AUSCELL 26 Ah.
The standby batteries should be in the enclosure as shown in Fig. 6. Allow a
sufficient air gap between them (10 mm recommended) to allow for heat
dissipation.
Fig. 6: Installing the batteries at the bottom of the housing
Fig. 7: Position and function of the main board connectors
RISK OF EXPLOSION - IF BATTERY IS REPLACED BY INCORRECT TYPE.