EasyManua.ls Logo

HORA M135 - Commissioning

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Commissioning
Rotary actuators 135 • M140 • M150 • M180
Operating instructions Version 2.0 - June 2012 23
5.4 Commissioning
1 Check whether all fitting and assembly work has been competently finished.
4 Assembly on page 11
2 Ensure that the actuation of the rotary actuator can take place safely without
putting people or devices at risk.
3 Ensure that the rotary actuator is attached correctly and that the rotary actuator’s
hood is closed.
4.4 Assembling/disassembling a hood on page 13
4 Ensure that the rotary actuator is set to automatic mode.
6.1 Changing between manual and automatic mode on page 24
5 Ensure that the final position switches are set correctly.
5.1 Setting a limit position switch on page 20
6 Apply supply voltage. The rotary actuator is ready for operation.

Related product manuals