EasyManua.ls Logo

HOUNO B - Installation Checklist; Drain Connection; Function Test

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54 INSTALLATION MANUAL
DRAIN CONNECTION
Drain Connection Yes No
Heat-resistant drain tube connected.
Fall of at least 3º or 5%.
CombiPlus tted with open drain for both ovens.
The drain must never end directly beneath the oven.
VOLTAGE AND WATER SUPPLY
Insert the measured values.
Voltage measured at:
Water pressure measured at:
(min. 2 bar/28,5 psi max. 6 bar/88 psi).
Yes No
Does the voltage on site comply with the voltage stated
on the approval plate?
Dirt lter fitted.
FUNCTION TEST
Yes No
All electrical connections are tight.
All water connections are tight and have been fastened.
All functions are operable.
All equipment is operable
INSTALLATION CHECKLIST

Related product manuals