51
Fabric name: 48:33:43:2d:46:43:1A:1A
Priority: 128
Domain ID: 11 (preferred)
Principal switch running time information:
Priority: 1
Path Interface
Upstream Vfc1
Downstream Vfc2
The output shows that:
{ The domain configuration was complete.
{ The principal switch assigned domain ID 11 to Switch A.
# Display the domain ID list of VSAN 1.
[SwitchA-vsan1] display fc domain-list vsan 1
Domain list of VSAN 1:
Number of domains: 4
Domain ID WWN
0x01(1) 48:33:43:2d:46:43:1B:1B [Principal]
0x0b(11) 48:33:43:2d:46:43:1A:1A [Local]
0x0d(13) 48:33:43:2d:46:43:1C:1C
0x0e(14) 48:33:43:2d:46:43:1D:1D
The output shows that Switch B became the principal switch and assigned the smallest domain ID
1 to itself.