EasyManua.ls Logo

HP Integrity BL860c i2

HP Integrity BL860c i2
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Install the server blade.
The server blade should come up to standby power. The server blade is at standby power if the
blade power LED is amber.
Server blade power states
The server blade has three power states: standby power, full power, and off. Install the server
blade into the enclosure to achieve the standby power state. Server blades are set to power on to
standby power when installed in a server blade enclosure. Verify the power state by viewing the
LEDs on the front panel, and using Table 5.
For more front panel LED information, see “Front panel LEDs (page 93).
Installing and powering on the server blade 21

Table of Contents

Other manuals for HP Integrity BL860c i2

Related product manuals