Operations 19
CAUTION: To prevent damage to electrical components, take the appropriate anti-static
precautions before beginning any installation, removal, or replacement procedure. Improper
grounding can cause electrostatic discharge.
1. Power down the server (on page 18).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Place the server on its side.
4. Remove the access panel:
a. Loosen the access panel thumbscrews.
b. Slide and remove the access panel from the server.
Install the access panel
1. Install the access panel:
a. Place the access panel on the chassis, and slide it towards the front of the server.