Hardware options installation 82
8. Install the TPM board. Press down on the connector to seat the board ("System board components" on
page 11).
9. Install the TPM security rivet by pressing the rivet firmly into the system board.
10. Install the controller in slot 5.
11. Install the system air baffle (on page 24).
12. If removed, install the PCI air baffle ("Install the PCI air baffle" on page 22).
13. Install the access panel (on page 19).
14. Return the server to an upright position.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server (on page 18).