EasyManua.ls Logo

HP ProLiant ML150 Gen9 - Eight-Bay SFF Hot-Plug Drive Cage

HP ProLiant ML150 Gen9
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal and replacement procedures 41
a.
Position the heatsink on the processor backplate.
b. Tighten one pair of diagonally opposite screws halfway, and then tighten the other pair of screws.
c. Finish the installation by completely tightening the screws in the same sequence.
7. Install the system air baffle.
8. If removed, install the PCI air baffle.
9. Install the access panel.
10. Return the server to an upright position.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server.
14. Install and lock the tower bezel.
Eight-bay SFF hot-plug drive cage
To remove the component:
1. Unlock and remove the tower bezel ("Remove the tower bezel" on page 23).
2. Power down the server (on page 23).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Remove all drives ("Hot-plug drive" on page 27) and drive blanks ("Hot-plug drive blank" on page
27).
5. Place the server on its side.
6. Remove the access panel (on page 24).
7. If installed, remove the PCI air baffle (on page 25).
8. Remove the system air baffle (on page 24).
9. Remove the fans (on page 25).
10. Disconnect the two Mini-SAS cables and the power cable from the drive cage backplane.

Table of Contents

Other manuals for HP ProLiant ML150 Gen9

Related product manuals