EasyManua.ls Logo

HP ProLiant ML30 Gen9 - Installing Storage Controller and FBWC Module Options

HP ProLiant ML30 Gen9
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Remove any existing expansion boards blocking access to the system fan connector.
8. Remove the system fan:
a. Disconnect the fan power cable.
b. Remove the screws from the rear panel.
c. Remove the fan.
To replace the component, reverse the removal procedure.
Replacing a Smart Storage Battery
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and internal system components
to cool before touching them.
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
1. Power down the server.
2. Disconnect the power cord from the power source and the server.
3. Remove the bezel.
4. Place the server on its side with the access panel facing up.
5. Remove the access panel.
6. Remove the air baffle.
7. Disconnect the Smart Storage Battery cable from the system board.
8. Press the Smart Storage Battery retainer down to release the battery, then lift the battery out of the holder.
Replacing a Smart Storage Battery 47

Table of Contents

Other manuals for HP ProLiant ML30 Gen9

Related product manuals