69
electromagnetic interference. See EMI prevention
EMI prevention, 3
emulation (pa
rameter), 31
environ
ment
examining installation site, 2
sit
e cleanliness, 2
site du
st concentration, 2
s
ite gas saturation, 2
site humidity
, 2
site tempe
rature, 2
examining in
stallation site, 2
F
fan
failure (troubl
eshooting), 40
fan tray
installation, 41
status LE
D, 61
fiber
lase
r safety recommendations, 3
field repla
cement unit. See FRU
flow co
ntrol (parameter), 31
flowchart of IRF fabri
c setup, 33
FRU
compatibility matrixes, 51, 51
G
garbl
ed display (troubleshooting), 43
gas (i
nstallation site), 2
grou
nding
EMI prevention, 3
grou
nding conductor buried in the earth
ground, 17
grou
nding strip, 15
swit
ch, 15
swit
ch through AC power cord, 18
swit
ch with a grounding conductor buried in
the earth ground, 17
swit
ch with grounding strip, 15
H
h
ardware
10/100/1000 Base-T autosensing Ethernet
port LED, 59
10/100/1
000 Base-T autosensing Ethernet
port technical specifications, 55
con
necting PSR150-D1(JD366B), 23
c
onnecting
PSR720-56A(JG544A)/PSR1110-56A(JG545
A)/PSR150-A1(JD362B), 24
con
sole port technical specifications, 54
fan tray statu
s LED, 61
grou
nding switch, 15
grou
nding switch through AC power cord, 18
grou
nding switch with a grounding conductor
buried in the earth ground, 17
grou
nding switch with grounding strip, 15
interface ca
rd installation, 24, 25
interface ca
rd port status LED, 61
interfac
e card removal, 26
interface ca
rd status LED, 60
manag
ement Ethernet port LED, 60
manag
ement Ethernet port technical
specifications, 54
mounting b
racket kit, 8
port mod
e LED, 59
port technical
specifications, 54
power supply
, 18
power supply
input status, 61
power supply
output status, 61
power supply
removal, 18
power supply
status LED, 58
PSR150
(JD362A, JD362B, JD366A, or JD366B)
power supply installation, 19
PSR150
(JD362A, JD362B, JD366A, or JD366B)
power supply removal, 20
PSR720
-56A/PSR1110-56A (JG544A/JG545A)
power supply installation, 20
PSR720
-56A/PSR1110-56A (JG544A/JG545A)
power supply removal, 22
SFP+ port LE
D, 60
SFP+ port te
chnical specifications, 55
swit
ch installation, 1, 6
swit
ch installation in 19-inch rack, 7
system status
LED, 58
USB port technical sp
ecifications, 54
verifying swit
ch installation, 26
workb
ench switch mounting, 15
humidity (installation site), 2
I
ID (IRF member), 34
identifying
IRF master switch, 34
IRF memb
er switch physical ports, 35
installing
ac
cessories, 4
EMI prevention, 3
examining in
stallation site, 2
fan tray
, 41
front and rear mounting b
racket kit, 12
front mountin
g bracket kit, 8
interface ca
rd, 24, 25
IRF fabri
c installation site planning, 34