AP7052DN&AP7152DN
Hardware Installation and Maintenance Guide
5 Appendix
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Cross-Section
al Area of
Conductor
(mm
2
(in.
2
))
Value of L1
(mm(in.))
Cross-Sectional
Area of Conductor
(mm
2
(in.
2
))
Value of L1
(mm(in.))
1 (0.002)
8 (0.31)
10 (0.015)
15 (0.59)
1.5 (0.002)
10 (0.39)
16 (0.025)
15 (0.59)
2.5 (0.004)
10 (0.39)
25 (0.039)
18 (0.71)
4 (0.006)
12 (0.47)
35 (0.054)
19 (0.75)
6 (0.009)
14 (0.55)
50 (0.077)
26 (1.02)
Step 2 Put the cord end terminal onto the conductor, and ensure that the conductor is aligned with the
edge of the cord end terminal, as shown in Figure 5-34.
After the conductor is fed into the cord end terminal, the protruding part of the conductor
must not be longer than 1 mm (0.04 in.).
Figure 5-34 Putting the cord end terminal onto the conductor
Step 3 Crimp the joint parts of the cord end terminal and the conductor, as shown in Figure 5-35.