Step 4 Take the compute nodes out of the ESD bags and place them separately on the ESD floor.
NOTE
Take out the compute node only before you install it immediately.
Figure 4-3 Proper operation
Figure 4-4 Improper operations
----End
4.2.3 Installing Optional Parts
Before installing and configuring a compute node, you need to install all optional parts
required, such as extra CPUs, drives, and mezzanine cards.
Procedure
Step 1 Install the optional parts for the CH121 V5.
For details, see 5.2 Optional Parts.
----End