– If information about the new memory module is displayed, the replacement is
successful.
– If information about the original memory module is displayed, access the BIOS and
check memory information.
For details, see Huawei Server Purley Platform BIOS Parameter Reference.
----End
5.2.9 Installing the TPM
Procedure
Step 1 Power off the compute node.
For details, see 3.1 Power-Off Procedure.
Step 2 Remove the compute node.
For details, see 3.3 Removing a CH121 V5.
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see 3.5 Removing the Cover.
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the TPM.
Figure 5-25 Position of the TPM
Step 7 Install the TPM.
1. Insert the TPM vertically into the connector on the mainboard. See (1) in Figure 5-26.
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 113