EasyManua.ls Logo

Huawei FusionServer Pro CH121 V5 - Installing the TPM

Huawei FusionServer Pro CH121 V5
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If information about the new memory module is displayed, the replacement is
successful.
If information about the original memory module is displayed, access the BIOS and
check memory information.
For details, see Huawei Server Purley Platform BIOS Parameter Reference.
----End
5.2.9 Installing the TPM
Procedure
Step 1 Power off the compute node.
For details, see 3.1 Power-Off Procedure.
Step 2 Remove the compute node.
For details, see 3.3 Removing a CH121 V5.
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see 3.5 Removing the Cover.
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the TPM.
Figure 5-25 Position of the TPM
Step 7 Install the TPM.
1. Insert the TPM vertically into the connector on the mainboard. See (1) in Figure 5-26.
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 113

Table of Contents

Related product manuals