EasyManua.ls Logo

Huawei FusionServer Pro CH121 V5 - 3.5 Removing the Compute Node Cover

Huawei FusionServer Pro CH121 V5
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.5 Removing the Cover
Procedure
Step 1 Power off the compute node.
For details, see 3.1 Power-Off Procedure.
Step 2 Remove the compute node.
For details, see 3.3 Removing a CH121 V5.
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
1. Press the button on the cover and push the cover backwards as far as it will go. See (1)
and (2) in Figure 3-10.
2. Lift the chassis cover. See (3) in Figure 3-10.
Figure 3-10 Removing the cover
----End
3.6 Installing the Cover
Procedure
Step 1 Place the compute node on the ESD workstation.
Step 2 Take the spare part out of its ESD bag.
Step 3 Install the cover.
FusionServer Pro CH121 V5 Compute Node
User Guide
3 Basic Operations
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 35

Table of Contents

Related product manuals