EasyManua.ls Logo

Huawei FusionServer Pro CH121 V5 - Installing a Mezzanine Card

Huawei FusionServer Pro CH121 V5
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.2.6 Installing a Mezzanine Card
Procedure
Step 1 Power off the compute node.
For details, see 3.1 Power-Off Procedure.
Step 2 Remove the compute node.
For details, see 3.3 Removing a CH121 V5.
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see 3.5 Removing the Cover.
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the mezzanine card.
Figure 5-9 Numbering and positions of mezzanine cards
Step 7 Install the mezzanine cards.
1. Align the lower mezzanine card with the positioning holes and metallic studs on the
mounting base, and press the mezzanine card vertically downwards into the connector on
the mainboard. See (1) in Figure 5-10.
2. Tighten the two captive screws c and d (shown in Figure 5-10) to secure the lower
mezzanine card.
3. Align the upper mezzanine card with the positioning holes and metallic studs on the
mounting base, and press the mezzanine card vertically downwards into the connector on
the mainboard. See (2) in Figure 5-10.
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 101

Table of Contents

Related product manuals