4. Tighten the two captive screws a and b (shown in Figure 5-10) to secure the upper
mezzanine card.
Figure 5-10 Installing mezzanine cards
Step 8 Install the cover.
For details, see 3.6 Installing the Cover.
Step 9 Install the compute node.
For details, see 3.4 Installing a CH121 V5.
Step 10 Power on the compute node.
For details, see 3.2 Power-On Procedure.
Step 11 Configure the BIOS, OS, switch, and FC disk array for the mezzanine cards.
l BIOS configuration
For details, see the user guide of the mezzanine card you use.
l OS configuration
For details, see the user guide of the mezzanine card you use.
l Switch configuration
For details, see the configuration guide of the switch you use.
l FC configuration
For details, see the configuration guide of the FC disk array you use.
Step 12 Check whether the mezzanine firmware version is the latest.
l If yes, no further action is required.
l If no, go to Step 13.
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 102