Figure 9-22 Grid parameters
Step 4 Grid Parameters, Protection Parameters, Feature Parameters, Power
Adjustment, and Power Baseline of the new device must be synchronized with
those of the running device. This section uses Grid Parameters settings as an
example to describe how to synchronize data. The operations for setting other
parameters are similar.
Click Monitoring, select a running device, choose Running Param. > Grid
Parameters > All > Batch
congurations, and click Conrm to synchronize data
to the new device.
Figure 9-23 Setting running parameters
Step 5 Click Monitoring.
1. Select the faulty Smart PCS, choose Running Param. > Adjustment, and
record the values of Adjust total energy yield and Calibration of total
power supply from grid.
LUNA2000-200KTL-H0 Smart Power Control System
User Manual 9 Device Maintenance
Issue 05 (2022-06-30) Copyright © Huawei Technologies Co., Ltd. 83