EasyManua.ls Logo

Huawei RTN XMC ODU V200 - Installing the PGND Cable of the ODU

Huawei RTN XMC ODU V200
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
Installing the PGND Cable of the ODU
PGND Cable of the ODU
Remove the anticorrosion paint and oxidizing layer at the
grounding point before the installation. After the connection is
complete, waterproof and antirust measures should be taken for
the grounding point.
Grounding clip base
1.To facilitate the installation, connect the IF cable to the
IF interface of the ODU and waterproof the connector,
and then connect the PGND cable of the ODU.
2. After installing ground cables, spread antirust around
the ground screws and the ground points of mechanical
parts for protection. Note that rust inhibitor is not
delivered with the ODU.
Installing ODU Cables
Installing the PGND Cable of the ODU(NA)
PGND Cable of the ODU
Grounding bar

Related product manuals