PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
8 Installation Verification
Copyright © Huawei Technologies Co., Ltd.
8 Installation Verification
After installing the cabinet and all equipment, check the installation items, installation
environment, and cables.
Checking the Cabinet Installation
Table 8-1 Cabinet installation checklist
The cabinet is placed in accordance with the design
drawing.
All bolts, especially the bolts used for electrical
connections, are fully tightened. Flat washers and spring
washers are all installed in correct sequence.
The cabinet is clean, free of dust and dirt.
All labels are correct, clear, and complete.
Checking the Environment
Table 8-2 Environment checklist
There are no unnecessary adhesive tape or cable ties on
cables.
There are no adhesive tapes, cable ties, paper scraps, or
packing materials around the cabinet.