EasyManuals Logo

Huawei SUN2000-6KTL-M1 User Manual

Huawei SUN2000-6KTL-M1
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #98 background imageLoading...
Page #98 background image
Figure 7-10 Detect optimizer disconnection
7.2 Parameters Settings
Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see B Device Commissioning.
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar App and SUN2000 App User Manual
. You can also scan the QR
code to obtain the document.
7.2.1 Energy Control
7.2.1.1 Grid-tied Point Control
Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the power deviation limit.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
SUN2000-(3KTL-10KTL)-M1 Series
User Manual 7 Man-Machine Interaction
Issue 17 (2024-01-12) Copyright © Huawei Technologies Co., Ltd. 88

Table of Contents

Other manuals for Huawei SUN2000-6KTL-M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-6KTL-M1 and is the answer not in the manual?

Huawei SUN2000-6KTL-M1 Specifications

General IconGeneral
Max. Efficiency98.4%
Rated AC Output Power6000 W
Max. AC Apparent Power6600 VA
AC Grid Frequency50/60 Hz
Dimensions525 x 470 x 146.5 mm
Weight17 kg
Operating Temperature Range-25°C to +60°C
IP RatingIP65
Max. DC Voltage1100 V
Start Voltage200 V
European Weighted Efficiency97.8%
Cooling MethodNatural Convection
Max. DC Power9000 W
Nominal Output Voltage230 V

Related product manuals