EasyManua.ls Logo

Huawei UPS5000-E-300K-SMT - Page 215

Huawei UPS5000-E-300K-SMT
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
5 Operations
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
206
The following operations are specified for a single UPS. For parallel systems, contact
Huawei technical support.
Before powering on the UPS, check that the UPS has passed all check items described in
section 3.4 Installation Verification, and check that all external and internal switches are
OFF (except for the ready switches for the power module and bypass module, which are in
locked state). Figure 5-1 shows the bypass module ready switch, and Figure 5-2 shows the
power module ready switch.
Figure 5-1 Bypass module ready switch
Figure 5-2 Power module ready switch
Procedure
Step 1 Power on the UPS. The following describes the details about powering on the UPS in full
configuration and in standard configuration.
To power on a UPS in full configuration, perform the following operations: (A UPS in
full configuration is configured with the internal mains input switch, internal bypass
input switch, internal output switch, and internal maintenance bypass switch.)

Table of Contents

Other manuals for Huawei UPS5000-E-300K-SMT

Related product manuals