UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
a. Close the external bypass and mains input power distribution switches.
b. Close the internal bypass input switch, mains input switch, and output switch.
The UPS starts initialization. The LCD displays the Huawei logo and an initialization
progress bar.
To power on a UPS in standard configuration, perform the following operation: (A UPS
in standard configuration is configured with only the internal maintenance bypass
switch.)
Close the external bypass and mains input power distribution switches.
The UPS starts initialization. The LCD displays the Huawei logo and an initialization
progress bar.
Step 2 After the LCD starts, perform the following steps:
If the UPS is starting for the first time, set the language, date and time, network
parameters, and system parameters on the Settings Wizard screen.
If this is not the first startup, retain the previous settings.
After the settings are specified, the Bypass mode and No battery alarms are displayed on the LCD.
The main buttons on the Settings Wizard screen are described as follows:
Tap Previous to return to the upper-level screen.
Tap Next to go to the next screen.
Tap Cancel to exit the Settings Wizard screen.
1. Press Down and Up to view the available language types, as shown in Figure 5-3.
Figure 5-3 Language screen
2. Tap Next to enter the Time screen and select a date format, as shown in Figure 5-4.
Ensure the date and time is set correctly. Incorrect time display in running and alarm
information can lead to analysis errors during maintenance or repair.