4
Installation
Choose a zone with full sun exposure that is 
in the fastest-drying area of the landscape. If 
necessary, move valve wires so that this is the 
last (highest-numbered) station to water.
Choosing the Probe Location
The moisture-sensing Soil-Clik probe must be installed 
within 1,000' (300 m) of the Soil-Clik module, using  
18 AWG (1 mm
2
) direct burial (UF) wire.
Choosing the Zone
Install the probe within the last typical zone to irrigate, 
so that normal irrigation will not interrupt watering 
prematurely.
1,000' (300 m)