EasyManua.ls Logo

Hussmann DSF - Page 22

Hussmann DSF
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
Installation (Cont'd)
Corrigan Retro• t Instructions
Step 1: Marking and Drilling Pilot Holes
If the existing Misting Channel does not have 1/8" diameter
holes in the location shown, these holes will have to be
marked and drilled.
Option 1:
Mark the two hole locations as speci! ed in the
diagram.
After marking a mark, use a sharp 1/8" diameter drill bit to
create a clean through hole.

Table of Contents

Other manuals for Hussmann DSF

Related product manuals