84
Multifeed Setting & Operating Risks
Multifeed Barfeed – Operating Risks
- Manual loading of raw material into barfeeder bar rack/magazine – manual
handling training to be put into practice – Werner HSE.
- Repetitive strain when loading magazine
- Barfeed interface cable with CNC machine tool – 25mm diameter conduit
cable run is under rear control panel of machine tool, ensure this is not
exposed to walk ways, or outside cell confines.
- Push rods interchanged for a smaller diameter is an option, trained personal
must complete this task only.
- PPE and task appropriate clothing must be worn to site requirements at all
times.