MAINTENANCE
5-52 HPR260 Manual Gas Instruction Manual
Preventive Maintenance Master Schedule
Daily:
•  Verify proper inlet gas pressure.
•  Verify proper gas flow settings. – Mandatory at every consumable change.
•  Inspect torch and replace consumables as needed.
Weekly:
Week Jan Feb March April May June July Aug Sept Oct Nov Dec
1
2
3
4
5
Semi-Annually:
Year 1
st 
Service 2
nd
Service
•  Clean power supply with dry, oil free compressed air, or a vacuum cleaner.
•  Verify cooling fans are working properly.
•  Clean torch threads and current ring.
•  Verify proper coolant level.
Annually:
Year
•  Replace service parts per the Service Part Replacement Schedule.
•  Replace service parts per the Service Part Replacement Schedule.