6. See Figure 60. Align the holes on the cable guide arm assembly with the pegs
on the 4800 unit. Insert the top peg first and then slightly squeeze the unit to
insert the bottom peg.
7. Complete the steps described in “Routing the cables.”
Routing the cables
Important
Ensuring that the cables are neatly routed reduces entanglements and saves
space.
For ease of installation, IBM recommends that you route the cables in the following
order:
1. Power cord
2. Ethernet
3. Cash drawer and other peripheral devices (mouse, keyboard, printer)
Follow these instructions to route the cables:
1. Complete the instructions described in “Removing the cable guide” on page 66.
2. Open all of the velcro strips on the cable guide and the cable guide assembly
arm.
Figure 60. Attaching the cable guide arm assembly
Updated July 14, 2008
Chapter 2. Removal and replacement procedures 69