EASYBOX SLIM
Built-in dual-control thermostatic shower valves in this product range are:
A5877AA Circular escutcheon with on/off ow control
A5878AA Square escutcheon with on/off ow control
A5879AA Circular escutcheon with 3 function diverter (to bath, off, or shower)
A5880AA Square escutcheon with 3 function diverter (to bath, off, or shower)
A5958AA Shower pack: ow control, circular escutcheon, 3 function kit & wall elbow
A5959AA Shower pack: ow control, square escutcheon, 3 function kit & wall elbow
IMPORTANT
BEFORE CONNECTION, FLUSH WATER
THROUGH PIPEWORK TO REMOVE ALL
DEBRIS ETC. WHICH COULD DAMAGE
THE VALVE MECHANISM
Installation Instructions
Thermostatic Built-In Shower Valves
INSTALLER
After installation please pass
this instruction sheet to user
40
Low prole valves suitable for slim duct systems
Question and Answer IconNeed help?

Do you have a question about the Ideal-Standard Easybox Slim Series and is the answer not in the manual?

Ideal-Standard Easybox Slim Series Specifications

General IconGeneral
BrandIdeal-Standard
ModelEasybox Slim Series
CategoryControl Unit
LanguageEnglish

Summary

4 PRE-INSTALLATION NOTES

4.3 MOUNTING OPTIONS

4.7 VALVE-BOX SEALING SYSTEM

5 INSTALLATION GUIDE - KIT.1

5.1 CONNECTING PIPE-WORK

Guides on connecting hot and cold water supply pipes to the valve-box before wall mounting.

5.2 MOUNTING METHODS

5.3 OPTIONAL ADJUSTABLE FIXING LEGS

5.4 MOUNTING VALVE-BOX INTO A SOLID WALL

5.5 MOUNTING VALVE-BOX INTO A PRE-FABRICATED POD WALL

5.6 MOUNTING VALVE-BOX INTO A PANEL

5.7 MOUNTING VALVE-BOX INTO A TIMBER STUD WALL

5.8 COMPLETING PIPE-WORK

6 PREPARATION FOR CHROME TRIM (KIT-2)

6.1 DESCRIPTION OF CHROME TRIM (KIT-2)

6.2 INSTALLATION OF CHROME TRIM (KIT-2)

Step-by-step instructions for fitting the escutcheon plate, lid, and handles.

6.3 PRODUCTS WITH INTEGRAL DIVERTER

7 OPERATION

8 MAXIMUM TEMPERATURE STOP

9 CALIBRATION OF THERMOSTAT

10 ISOLATING VALVES & MAINTENANCE

10.1 COMMISSIONING & PERIODIC CHECKS

Procedures for initial commissioning and annual checks to ensure correct valve functioning.

11 THERMOSTATIC CARTRIDGE REPLACEMENT

12 FLOW CARTRIDGE REPLACEMENT

13 DIVERTER CARTRIDGE REPLACEMENT

14 CHECK-VALVE CARTRIDGE REPLACEMENT