EasyManua.ls Logo

INNO VIEW 5 - Operation Procedure; Arc Calibration

INNO VIEW 5
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7 Maintenance Menu 38
Operation procedure
Select [Motor Calibration] in [Maintenance Menu].
Load prepared bers in the splicer, and press [SET].
Speeds for all motors are automatically calibrated. Upon completion,
the message “Operation Complete” will be displayed.
Note: Perform this function when “Fat” or “Thin” error occurs, or ber aligning
or focusing takes too much time.
Arc calibration
Atmospheric conditions such as temperature, humidity and pressure are
constantly changing, which creates variability in the arc temperature. VIEW 5 is
equipped with temperature and pressure sensors that are used in a constant
feedback monitoring control system to maintain the arc power at a stable level.
However, changes in arc power due to electrode wear and glass adhesion cannot
be calibrated automatically. Also, the center position of arc discharge sometimes
shifts to the left or to the right. In this case, the ber splicing position has to be
shifted in relation to the arc discharge center. It is necessary to perform an arc
power calibration to eliminate those problems.
Note: Performing arc calibration function changes the parameter of the system.
The arc power value will not be changed in the splice modes.
Operation procedure
Select [Arc Calibration] in [Maintenance Menu] to display arc calibration on the
screen.
Place prepared bers into the splicer, and press [SET] to perform arc calibration.
Note: Use standard SM, DS or MM ber for arc calibration. Use well-prepared
bers for arc calibration since dust on the ber surface affects arc calibration.

Table of Contents