21
company, you are recommended to timely update the software and related
documents.
6.2 Programming Environment and Software Installation
Hardware requirements: A desktop PC or a laptop running Windows XP or above,
with 2 GB RAM and more than 5 GB free space on the hard disk or SSD. To ensure
performance, the CPU frequency should be above 2 GHz.
The PC can be connected with the PLC through a LAN cable. It is recommended
to use a router between the PC and PLC. That allows for longer distance and
program the PLC running in the workshop, for example. Therefore, a free LAN
network port in the local network and a network cable are required.
The PC can also be connected with the PLC through a USB cable. In this case, a
USB cable with a MiniUSB connector is required.
7 Operation and Maintenance
7.1 Start and Stop
Start and stop the system in the following procedure.
To start the system after the CPU module is programmed in STOP state:
.',
36/
4501
4XJUDIUP36/
1. Set Set the RUN/STOP switch to the RUN position
2. Check that the RUN indicator is steady on and green
MFK
RUN/
STOP
0
0
0
圶坚坌块坆坋圃块坒圃STOP
3. Set the RUN/STOP switch to the STOP position to stop
the system. The system can also be stopped by the host
computer.