EasyManua.ls Logo

INVT GD350-2R2G-4 - Maintenance and Component Replacement; Scrap Treatment

INVT GD350-2R2G-4
341 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Goodrive350 series high-performance multi-function inverter Chapter 1
-4-
For inverters that have been stored for a long time, set the capacitance and carry out
inspection and pilot run on the inverter before use.
Close the front cover before running; otherwise, electric shock may occur.
1.4.3 Maintenance and component replacement
Note:
Use proper torque to tighten the screws.
Keep the inverter and its parts and components away from combustible materials during
maintenance and component replacement.
Do not carry out insulation voltage-endurance test on the inverter, or measure the control
circuits of the inverter with megameter.
Take proper anti-static measures on the inverter and its internal parts during maintenance and
component replacement.
1.4.4 Scrap treatment

Table of Contents

Related product manuals