EasyManuals Logo
Home>ITech>Measuring Instruments>IT8200 Series

ITech IT8200 Series User Manual

ITech IT8200 Series
147 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
Instrument Introduction
Copyright ©ITECH Electronic Co., Ltd. 18
to use a forklift or crane to move the cabinet.
ITECH 27U and 37U cabinets are equipped with hoisting rings as
standard on the top. It is recommended to use a crane equipped with
a four-leg hoisting belt structure for horizontal hoisting and moving,
and ensure that the four hoisting belts are the same length to avoid
cabinet skew during movement. As shown below.
After moving to the destination, please lock the four casters to se- cure
the cabinet.
The cabinet should be placed on a level ground. It is forbidden to place
the cabinet on a sloped ground.
2.2 Verifying the Shipment
Open the package and check the articles within package box before operation.
In case of any non-conformity, missing or appearance wearing, please contact
ITECH immediately.
The package box should comprise:
Device name
Quantity
Model
Remarks
Programmable
AC electronic
load
x1
IT8200
series
For the specific models included in this
series, refer to 1.1 Brief Introduction.
Power Cord
X1
-
Number of the power cords vary
depending on the model, See the
Section 2.3 Connectiong the Power
Cord for power cord connection.
USB cable
x1
-
-

Table of Contents

Other manuals for ITech IT8200 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITech IT8200 Series and is the answer not in the manual?

ITech IT8200 Series Specifications

General IconGeneral
BrandITech
ModelIT8200 Series
CategoryMeasuring Instruments
LanguageEnglish