EasyManua.ls Logo

ITRON Centron - Inspecting and Troubleshooting-C1 S LCD and C1 SR

ITRON Centron
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Testing, Troubleshooting, and Maintenance
78 CENTRON® Meter Technical Reference Guide
Reset Mechanism Does Not Initiate Demand Reset
Reset Has Occurred Within Last Programmable Time PeriodManual demand reset
cannot occur within 60 seconds of the previous demand reset. Wait 60 seconds before
trying again.
Reset Switch DisabledReset switch may be disabled through software.
Register Board not Properly Installed in Upper HousingVerify that the Register
board is fully engaged with the upper inner cover.
Demand Reset Cannot Be Initiated Through PC or Handheld
Insufficient security.
Communication cannot be established. See Programmer Cannot Communicate with
Meter.
Test Mode Switch Does Not Place Meter in Test Mode
No display items in Test Mode Display List.
Switch deactivated by softwareActivate switch in software and reprogram meter.
Register Board not Properly Installed in Upper HousingVerify that the Register
board is fully engaged with the inner cover.
Switch or Electronic FailureReturn meter for repair.
Inspecting and TroubleshootingC1S LCD and C1SR
Blank Display
Power Not Applied to MeterApply voltage to the meter.
Voltage Too Low for Meter Startupthe CENTRON meter requires at least 20% of
nominal voltage to start up.
Component FailureReturn the meter for repair.
Board-to-Board Connector Not SeatedVerify proper connection of board-to-board
connector.

Table of Contents

Related product manuals