EasyManua.ls Logo

JF TECH JRC-27F - Shelf Installation; Front Panel

Default Icon
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
⑦cover the machine ⑧fix the cover
2.3 Shelf Installation
This product chassis specification is standard 1u, so it can be installed in the standard shelf.
Installation steps and attention items:
1. Make sure the temperature in the room lower then 35℃ (95°f).
2. Keep the equipment has 15cm (6 inches) space around in order to air's circulation.
3. From bottom to shelf installation.
4. When multiple components install in the frame,please take preventive measures to avoid
power socket overload.
2.4 Front Panel
2.4.1 B series
NO.
NO.
Function
NO.
Function
1
2
Power
3
Record
4
5
Menu
6
ESC
7
8
OK
9
CD-ROM
2.4.2 T Series
NO.
NO.
Function
NO.
Function
1
2
Record Indicator
3
Power Indicator

Table of Contents