⑦cover the machine ⑧fix the cover
2.3 Shelf Installation
This product chassis specification is standard 1u, so it can be installed in the standard shelf.
Installation steps and attention items:
1. Make sure the temperature in the room lower then 35℃ (95°f).
2. Keep the equipment has 15cm (6 inches) space around in order to air's circulation.
3. From bottom to shelf installation.
4. When multiple components install in the frame,please take preventive measures to avoid
power socket overload.
2.4 Front Panel
2.4.1 B series