JP-33 SERVICE MANUAL
- -
12
Maintenance Program - Change
6) Install replenishment tanks
- Place replenishment tanks in their proper location under the processor.
- Connect hoses or insert hoses into tanks. Refer to color codes and picture to prevent error.
- Color codes of hoses used with the processor
z Red: Developer
z Blue: Fixer
z Clear: Washer (Or Black six-foot hose with ¾ inch fittings).
7) Inspection
Check all hoses and connections for leaks.
Clean any spilled chemicals inside and outside the processor
8) Installation of racks and final testing.
- Install the cleaned rack in the marked location
Make sure main worm gears are positioned properly on the worm drive.
Lock racks into place
- Cover all racks.
- Turn the power on.
Check the operation of the racks and make sure there are no unusual noise, leaks or odors.
- Place top cover into position.
9) Check for proper operation by running one test film.