EasyManua.ls Logo

JR Venture CP - Rotor Head Installation; Flybar Installation

JR Venture CP
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-8
ROTOR HEAD INSTALLATION
65
2.6x12 mmSocket Head Bolt (1)
3x20 mmSocket Head Bolt (1)
3 mm Flat Washer (1)
2x12 mm Flat Head Screw (2)
2x12 mm Flat Head Screw (2)
Steel Joint Ball (2)
Steel Joint Ball (2)
Rotor Head Assembly
2 mm Hex Nut (2)
2 mm Hex Nut
2.6 mm Lock Nut (1)
2.6 mm Lock Nut
3 mm Lock Nut
3 mm Lock Nut (1)
3x20 mm Socket
Head Bolt
Note: Be sure to engage the
rotor hub pin into the washout
base groove before securing
the rotor head in place.
2.6x12 mm Socket
Head Bolt
3 mm Flat Washer (2)
4x4 mm Set Screw
Flybar
Center the flybar in the seesaw shaft
before securing the flybar control arm.
4-9
FLYBAR INSTALLATION
4x4 mm Set Screw
Use Blue Threadlock
Adjust so that A and B are
exactly the same length.
A
B
(2)
(2)

Table of Contents

Related product manuals