EasyManua.ls Logo

JRC JLN-900 - Page 67

JRC JLN-900
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-29
To complete the installation, the Intermediate Tube and Blanking Plate MUST FIRST BE
MANUFACTURED BY THE SHIPYARD and further welded to the Upper Flange DB and
the Bottom Flange DB.
Table 2.1
Intermediate Tube and Transducer Connecting Tube Lengths
Tank Hei
g
ht T Intermediate Transducer
Connectin
g
Tube
(
See Fi
g
. 2.2
)
Tube Len
g
th
(
mm
)
(
mm
)
Len
g
th
(
mm
)
Part No.
Ship specific Installation specific 700 71-19839-02
Ship specific Installation specific 900 71-19839-03
Ship specific Installation specific 1100 71-19839-04
< 700 / Ship specific 800 1300 71-19839-08
701-900 1000 1500 71-19839-10
901-1100 1200 1700 71-19839-12
1101-1300 1400 1900 71-19839-14
1301-1500 1600 2100 71-19839-16
1501-1700 1800 2300 71-19839-18
1701-1900 2000 2500 71-19839-20
1901-2100 2200 2700 71-19839-22
2101-2300 2400 2900 71-19839-24
2301-2500 2600 3100 71-19839-26
2501-2700 2800 3300 71-19839-28
2701-2900 3000 3500 71-19839-30
2901-3100 3200 3700 71-19839-32

Table of Contents

Related product manuals