KE2000 Installation Manual
21
7-3. Center station on the Y-axis drive side (For model 2030 only)
Remove the band fixing the transport unit of the Y-axis drive side (front reference and
rear reference, right side when viewed from the front) to detach the packing material put
between the base bridge and transport base.
Fig 7-3-1
300
reference size
Packing material
Belt
uttin
osition