C Transport and Commissioning
1 Lifting by crane
F
Only use lifting gear with sufficient capacity (for transport weight see truck data plate).
Z
The strap points (1) on the mast are for loading the truck with crane lifting gear.
Park the truck securely (see
Chapter E).
Secure the lifting slings to the
attachment points (1).
M
Attach the crane slings to the strap
points so that the truck cannot slip.
Lifting slings should be fastened to the
harness in such a way that they do not
come into contact with any parts of the
truck when it is being raised.
1
C 1
1004.GB
C Transport and Commissioning
1 Lifting by crane
F
Only use lifting gear with sufficient capacity (for transport weight see truck data plate).
Z
The strap points (1) on the mast are for loading the truck with crane lifting gear.
Park the truck securely (see
Chapter E).
Secure the lifting slings to the
attachment points (1).
M
Attach the crane slings to the strap
points so that the truck cannot slip.
Lifting slings should be fastened to the
harness in such a way that they do not
come into contact with any parts of the
truck when it is being raised.
1

Table of Contents

Other manuals for Jungheinrich HC 110

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jungheinrich HC 110 and is the answer not in the manual?

Jungheinrich HC 110 Specifications

General IconGeneral
BrandJungheinrich
ModelHC 110
CategoryForklifts
LanguageEnglish

Related product manuals