EasyManua.ls Logo

Juniper SRX220

Juniper SRX220
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 29 on page 81 provides the list of tasks you need to perform before installing the
device on a wall.
Table 29: SRX220 Services Gateway Preinstallation Checklist for
Wall-Mount Installation
Additional InformationTask
“Site Preparation Checklist for the
SRX220 Services Gateway” on page 27
Verify that the site meets the requirements.
“Unpacking the SRX220 Services
Gateway” on page 75
Remove the services gateway chassis from the
shipping box.
Verify that you have the following parts available in
your wall-mounting kit to mount the SRX220 Services
Gateway on a wall:
Wall-mounting brackets
Screws
NOTE: The wall-mounting kit is not shipped with the device and must be
ordered separately.
Related
Documentation
Site Preparation Checklist for the SRX220 Services Gateway on page 27
Unpacking the SRX220 Services Gateway on page 75
Preparing the SRX220 Services Gateway for Rack-Mount Installation on page 79
81Copyright © 2012, Juniper Networks, Inc.
Chapter 11: Installing the Mounting Hardware

Table of Contents

Other manuals for Juniper SRX220

Related product manuals