Installation and Operating Conditions
5 --- 30
Exhaust ducting
Consult the manufacturer on the design of the ducting, length, number of bends, etc.
Further information on exhaust air ducts can be found in chapter 13.1.3.
5.2.3 Operating in a compressed air network
When the machine is connected to an air network, the network operating pressure must
not exceed 16 bar.
Initial filling of a fully vented air network generally creates very a high rate of flow through
air treatment devices. These conditions are detrimental to correct air treatment. Air quality
suffers.
To ensure maintenance of desired air quality when filling a vented air main we recommend
the installation of an air main charging system.
KAESER is ready to offer good advice.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KAESER CSD 122 and is the answer not in the manual?

KAESER CSD 122 Specifications

General IconGeneral
BrandKAESER
ModelCSD 122
CategoryAir Compressor
LanguageEnglish

Related product manuals