KANE905 Operators Manual Page 11
4. NORMAL START UP SEQUENCE
EVERY TIME YOU USE THE ANALYSER
BEFORE SWITCH-ON CHECK THAT:
the particle filter is not dirty
the water trap and probe line are empty of water
all hose connections, etc, are properly made
the probe is sampling CLEAN AMBIENT air
the water trap is correctly fitted and the instrument upright
the flue temperature is connected
Switch ON the instrument by pressing
AUTOMATIC CALIBRATION
During this sequence the analyser pumps fresh air into the sensors to allow toxic
sensors (if fitted) to be set to zero and the Oxygen sensor to be set to 20.9 %.
After switch-on the analyser will briefly display header information :-
And then show the countdown
screen :-
The calibration time will count down in seconds to zero. Calibration time
may be changed to 90, 120, 180, 300 seconds. See SET-UP MENU.
Note! Three minutes is recommended to allow the sensors to stabilise
fully. Anything less than this may result in drift of the toxic and
oxygen sensors in clean ambient air.