20 DAB-BA-e-1813
7.6.1 Initial Commissioning
In order to receive precise weighing results from electronic balances, the instrument
unit must have reached its operating temperature (see warming-up time chapter 1).
For this warm-up period the integrated balance must be connected to the power
supply.
The accuracy of the integrated balance depends on the local acceleration of gravity.
Please observe hints in chapter Adjustment.
7.7 Connection of peripheral devices
Before connecting or disconnecting of additional devices (printer, PC) to the data
interface, always disconnect the moisture analyser from the power supply.
Only use accessories and peripheral devices by KERN, as they are ideally tuned to
the appliance.