B-2 September 2004
Argonite
®
Engineered Fire Suppression System
38-KFSARG-000
Table B-3. Total Flooding Quantities, Volume Requirements of Argonite
(Metric, kg/m3)
Temperature
(°C)
Design Concentration
(% by Volume)
34 38 40 42 46 50 54
-30 0.8566 0.9856 1.0532 1.1231 1.2703 1.4290 1.6009
-25 0.8224 0.9461 1.0110 1.0781 1.2196 1.3719 1.5369
-20 0.7899 0.9093 0.9711 1.0352 1.1710 1.3182 1.4768
-15 0.7602 0.8741 0.9338 0.9960 1.1259 1.2670 1.4193
-10 0.7316 0.8417 0.8986 0.9582 1.0840 1.2193 1.3656
-5 0.7041 0.8106 0.8653 0.9233 1.0437 1.1750 1.3155
0 0.6791 0.7806 0.8339 0.8897 1.0064 1.1322 1.2686
5 0.6549 0.7532 0.8041 0.8574 0.9705 1.0910 1.2235
10 0.6317 0.7267 0.7759 0.8276 0.9358 1.0528 1.1800
15 0.6092 0.7012 0.7492 0.7989 0.9038 1.0173 1.1394
20 0.5889 0.6779 0.7238 0.7725 0.8742 0.9830 1.1002
25 0.5694 0.6554 0.6997 0.7471 0.8443 0.9498 1.0637
30 0.5504 0.6337 0.6768 0.7225 0.8167 0.9191 1.0297
35 0.5334 0.6127 0.6550 0.6987 0.7900 0.8894 0.9969
40 0.5156 0.5936 0.6342 0.6769 0.7655 0.8607 0.9651
45 0.4997 0.5752 0.6144 0.6559 0.7418 0.8342 0.9344
50 0.4843 0.5573 0.5955 0.6355 0.7188 0.8084 0.9058
55 0.4700 0.5405 0.5776 0.6159 0.6967 0.7837 0.8780
Concentration Required: _________________%