7. Start-up
To avoid damage or serious injury during startup of the compressor, the following points
must be observed:
- The commissioning of the compressor may only be carried out by qualified staff in
compliance with the safety.
- Check before the first start that all tools and foreign objects were removed from the
compressor.
- Check before commissioning the motor rotation direction.
- Also read the chapter "General safety instructions".
7.1. Power
Electrical connection
.
Observe the following for the electrical connections;
- Comply with local electrical codes.
- Installation of electrical receptacles should be performed by licensed electricians.
Gasoline Engine
Note: Supplier for Gasoline Engine may vary.
7.2. Checks before initial Start-up
F Remove all packing used in transport
F Check that all screws and bolts are secure
F Check all cables and connectors.
F Check the oil level
The oil level should be at the middle mark on the dipstick, or higher.
F Check filter system for damage and completeness. Insert the filter car-
tridge.
All protective devices must be correctly fitted.