EasyManua.ls Logo

Komptec KT-90E - Pressure Buildup; To Fill the Pressure Cylinder

Komptec KT-90E
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KT-70E / KT-90E / KT-70SE User Manual Page 33 of 59 24 April 2018
After moving a cold compressor to a warm environment (requires a 15 minute warm
up period)
8.2.1.2. pressure buildup
Note: Units with MPV will
not show pressure until min-
imum pressure is achieved.
1. Build up pressure to 100 bar
8.2.1.3. To Fill the pressure cylinder.
1. Open filling valve slowly
(on compressor, on hose or
on target cylinder)
The filling process is to be
monitored !!
Units with Minimum Pres-
sure Valves should open fill-
ing valve prior to pressure
reaching MPV setting
i

Table of Contents